Grid Controller of India Limited (GRID-INDIA) is a division of the Ministry of Power, Government of India. The new name of Power System Operation Corporation Limited (POSOCO) is Grid Controller of India Limited (Grid-India) since 9 November 2022.[1] It is responsible for monitoring and ensure round the clock integrated operation of the Indian Power System. It consists of 5 Regional Load Despatch Centres (RLDCs) and the National Load Despatch Centre (NLDC).
The load despatch functions, earlier handled by Power Grid Corporation of India Limited (PGCIL), have been entrusted to Grid-India (previously known as POSOCO).
History
Central Government, through Ministry of Power in exercise of the power conferred by sub-section (3) of Section 26 and sub-section (2) of Section 27 of the Electricity Act, 2003 by notification dt. 27 September 2010 in the Gazette of India, notified that the Power System Operation Corporation Ltd (POSOCO), a wholly owned subsidiary of the Power Grid Corporation of India Limited (a Government Company), shall operate National Load Despatch Centre and the five Regional Load Despatch Centers, with effect from 1 October 2010.
The subsidiary was set up on the recommendations of a government committee headed by Mr. G.B. Pradhan (additional secretary) in the Union Ministry of Power. To make load despatch centres, financially self-reliant and autonomous, the committee recommended independent and sustainable revenue streams. The move to separate the two functions is in keeping with the provisions of the Electricity Act, 2003, which seeks to separate commercial interests from load management functions. The Pradhan Committee report had recommended setting up a separate representative board structure overseeing the functions of the five regional load despatch centres (RLDCs) run by PGCIL—the northern, eastern, north-eastern, western, and southern regions at that time. The subsidiary was eventually made a separate company effective from 2 January 2017.
Several steps were taken by the Central Government and Regulators in the formation of POSOCO. Some of the major milestones [2] are listed below.
• Vor 1994: Die RLDCs wurden von der CEA mit Budgetmitteln der indischen Regierung betrieben. • 1994–1996: Die RLDCs wurden schrittweise an POWERGRID übertragen. Die Budgetmittel der indischen Regierung wurden eingestellt. • Juli 1998: Die CEA schloss eine Ad-hoc-Vereinbarung zur Erstattung der RLDC-Ausgaben ab (120 Millionen Rupien für 1996/97). • 8. Mai 2003: Die CERC genehmigte die RLDC-Gebühren und -Entgelte für 2000/2001 (215,2 Millionen Rupien im ersten Jahr). • Ab 2005: Die Gebühren des ULDC-Programms wurden mit den RLDC-Gebühren und -Entgelten zusammengeführt und von der CERC genehmigt. • 22. August 2006: Treffen des Sekretärsausschusses zur Erörterung der Gründung einer hundertprozentigen Tochtergesellschaft der indischen Regierung, die alle Funktionen als unabhängiger Systembetreiber wahrnehmen sollte. • 5. November 2007: Interaktive Sitzung des Energieministeriums mit dem Forum der Regulierungsbehörden und der Landesregierung. Im Anschluss an diese Sitzung wurde im Februar 2008 der Pradhan-Ausschuss zur Abgrenzung der Lastverteilungszentren (LDCs) eingesetzt. • 4. Juli 2008: Richtlinie des Energieministeriums zur Gründung von POSOCO mit Vorstandsstruktur und schrittweiser Trennung nach fünf Jahren. • 11. August 2008: Bericht des Gireesh-B.-Pradhan-Ausschusses zu „Personal, Zertifizierung und Anreize für den Systembetrieb und die Abgrenzung von Lastverteilungszentren“ [ 3 ] vorgelegt. Der Bericht wurde angenommen und eine Sitzung am 7. Oktober 2008 vom Staatssekretär des Energieministeriums einberufen. [ 4 ] • 15. November 2008: Das Forum der Regulierungsbehörden (FOR) genehmigt die Gründung des „Forums der Lastverteiler (FOLD)“ und dessen Charta im Januar 2009. • November 2008: Bericht „Open Access – Theorie und Praxis“, der vom Forum der Regulierungsbehörden gebilligt wird. • 20. März 2009: Gründung der Power System Operation Corporation Ltd. (POSOCO) mit dem Ziel der Trennung von Netz- und Stromversorgungsnetzen; eingetragen als 100%ige Tochtergesellschaft von POWERGRID mit einem genehmigten Aktienkapital von 200 Crore Rupien. • März 2009: Vorlage des Berichts der Satnam-Singh-Taskforce zum Thema „Kapitalausgaben und Fragen der Vergütung von Mitarbeitern in Lastverteilungszentren“. [ 5 ] • Juni 2009: Bericht des Rakesh-Nath-Ausschusses zum Thema „Personalauswahl, Einstellungsverfahren und Amtszeiten von Mitarbeitern in SLDCs“. • 18. September 2009: CERC-Vorschriften zu den Gebühren und Entgelten gemäß dem Elektrizitätsgesetz von 2003, wodurch POSOCO finanzielle Autonomie erhält. [ 6 ] • 19. März 2010: Vorlage des Berichts des Dhiman-Ausschusses zum Thema „Schulung und Zertifizierung von Systembetreibern“. • 23. März 2010: Aufnahme der Geschäftstätigkeit durch POSOCO. • 1. Juni 2010: Transfer of manpower from POWERGRID to POSOCO on secondment basis.• 9 June 2010: Ministry of Power designated National Power Training Institute (NPTI) as the Certification Authority for executives of SLDCs, RLDCs, and NLDC for an initial period of 3 yrs. i.e., up to 31 March 2013• 26 September 2010: Gazette notification by Central Govt. of India that the POSOCO, a wholly owned subsidiary of POWERGRID, shall operate RLDCs/NLDC w.e.f. 1 Oct 2010.• 1 October 2010: POSOCO notified for operation of NLDC/RLDCs.• April 2011 – September 2011: 6 batches basic certification training at PSTI Bengaluru• November 2011: First online certification test completed, leading to 266 certified operators.• 15 March 2015: Sanction by President for setting up of POSOCO as a Govt. owned company.• 19 December 2016: Gazette notification by Central Govt. of India notifying POSOCO as a wholly owned Government company with effect from 3 January 2017.[7]• October 2018: Report on Capacity Building of Indian Load Despatch Centres by Forum of Regulators[8]
• 9 November 2022: Name of POSOCO changed to Grid Controller of India Limited (Grid-India).
The POSOCO was formed as an umbrella organization to give a corporate structure to RLDCs and NLDCs to ensure integrated operation of the Regional and National Power Systems to facilitate the transfer of electric power within and across the regions and transnational exchange of power.
Mandate for Load Despatch Functions
The Load Despatch functions in India derive their mandate from the Electricity Act 2003,[9] which acted as a major reform in the Power Sector for optimum scheduling and despatch of electricity. The relevant extracts of the Electricity Act 2003 are listed below.
EA 2003, Section 26:“Central Government may establish a centre at the national level, to be known as the National Load Despatch Centre for optimum scheduling and despatch of electricity among the Regional Load Despatch Centres.”
EA 2003, Section 27(2): “The Regional Load Despatch Centre shall be operated by a Government Company or any authority or corporation established or constituted by or under any Central Act, as may be notified by the Central Government.”
EA 2003, Section 28(1):“The Regional Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in the concerned region.”
Auch die von der indischen Regierung veröffentlichte Nationale Elektrizitätspolitik 2005 [ 10 ] betont die Bedeutung des unabhängigen Systembetriebs durch die nationalen (NLDC), regionalen (RLDC) und regionalen (SLDC) Stromverteilungsunternehmen. Der relevante Auszug aus der Nationalen Elektrizitätspolitik 2005 ist nachfolgend aufgeführt. Nationale Elektrizitätspolitik 2005, Abschnitt 5.3.7: „Der Sinn der Bestimmungen dieses Gesetzes besteht darin, einen unabhängigen Systembetrieb durch die nationalen (NLDC), regionalen (RLDC) und regionalen (SLDC) Stromverteilungsunternehmen zu gewährleisten.“
Führung und Management
Derzeit sind folgende Personen hauptberuflich als Funktionsdirektoren im Vorstand von POSOCO tätig: [ 11 ] -
- Sh. SRNarasimhan, Vorsitzender und Geschäftsführer
- Sh. Sameer Chandra Saxena, Direktor (Marktoperationen)
- Herr Rajiv Porwal, Direktor (Systembetrieb)
- Herr Paresh Ranpara, Direktor (Personalwesen)
- Herr Sanjay Mehrotra, Direktor (Finanzen)
GRID-INDIA verfügt über folgende Niederlassungen: [ 12 ]
- Nationales Lastverteilungszentrum (NLDC)
- Regionale Lastverteilungszentren (RLDCs)
- Northern Regional Load Despatch Centre (NRLDC) – Neu-Delhi
- Western Regional Load Despatch Centre (WRLDC) – Mumbai
- Östliches regionales Lastverteilungszentrum (ERLDC) – Kolkata
- Südliches regionales Lastverteilungszentrum (SRLDC) – Bengaluru
- Nordostregionales Lastverteilungszentrum (NERLDC) – Shillong & Guwahati
Zur Erleichterung der Integration erneuerbarer Energien (hauptsächlich Wind und Sonne) in großem Umfang in das Stromnetz, einschließlich der entsprechenden Erzeugungsplanung und -prognose, befinden sich vier Renewable Energy Management Centres (REMCs) in der Entwicklung: Northern Regional-REMC (gemeinsam mit dem NRLDC untergebracht), Western Regional-REMC (gemeinsam mit dem WRLDC untergebracht), Southern Regional-REMC (gemeinsam mit dem SRLDC untergebracht) und National-REMC (gemeinsam auf dem Gelände des NLDC untergebracht).
Nationales Lastverteilungszentrum
Am 25. Februar 2009 wurde das Nationale Lastverteilungszentrum (NLDC) von Sushilkumar Shinde (ehemaliger Energieminister) und Sheila Dixit (ehemalige Ministerpräsidentin des Nationalen Hauptstadtterritoriums Delhi) eingeweiht. Das NLDC wurde gemäß einer Bekanntmachung des Energieministeriums (Ministry of Power, MOP) vom 2. März 2005 in Neu-Delhi eingerichtet und ist die oberste Behörde für den integrierten Betrieb des nationalen Stromnetzes.
Regionale Lastverteilungszentren (RLDCs) und die ihnen unterstellten staatlichen Übertragungssysteme.
Die fünf RLDCs überwachen die bundesstaatenübergreifende Datenübertragung für die folgenden Bundesstaaten:
- Regionales Lastverteilungszentrum Nord (NRLDC): Delhi , Haryana , Himachal Pradesh , Jammu und Kaschmir , Ladakh , Punjab , Rajasthan , Uttar Pradesh , Uttarakhand
- Western Regional Load Despatch Center (WRLDC) : Maharashtra, Gujarat, Madhya Pradesh, Chhattisgarh, Goa, Daman and Diu, Dadra and Nagar Haveli
- Eastern Regional Load Despatch Center (ERLDC) : Bihar, Jharkhand, Odisha, West Bengal, Sikkim
- Southern Regional Load Despatch Center (SRLDC) : Tamil Nadu, Karnataka, Kerala, Andhra Pradesh, Telangana, Pondicherry
- North-Eastern Regional Load Despatch Center (NERLDC) : Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura
Each RLDC maintains its own dedicated website where scheduling and despatch of power within its respective control areas are handled round the clock.
POWERGRID transmission network failure
The Northern Region Grid, which provides power to 9 states in Northern India, including Delhi, experienced a widespread outage due to a grid disturbance that occurred at about 2.35 a.m on 30 July 2012.
Restoration work started immediately under the direction of the CEO, POSOCO, and POWERGRID's chairman & managing director. A team of engineers tried to find a way to restore the normal supply of power immediately, so that Railways, Metro, Airports, and other power users deemed essential could get immediate restoration of electricity. With the coordinated efforts of the whole team of engineers and constituent state utilities, power supply to the essential services and other essential loads in northern India was restored by about 8.00 a.m., and about 60% of the load of the Northern Region was restored by 11:00 am. This was possible by gearing up the power supply from hydroelectric sources and also extending power from the Eastern and Western regions for start-up supply for thermal generating units of the Northern Region. Thus, the associated problems for want of power supply could be partially overcome by this time. Later, power supply was restored progressively, and by 12:30 p.m. power was extended to most of the cities and towns through POWERGRID sub-stations. The Northern Grid was brought back to normalcy to meet the demand of about 30 GW at 7:00 p.m.
On 31 July 2012, the northern grid collapsed for a second time, hours after the power supply was restored in the entire northern region following a disruption on the previous day. The eastern transmission lines also failed, disrupting power supply in Delhi, Uttar Pradesh, Haryana, West Bengal, Assam, and Punjab, among other states.[13]
Energieminister Veerappa Moily erklärte, dass die Übertragungsnetze in drei Monaten einer unabhängigen Prüfung unterzogen werden, um deren Ausfallsicherheit zu gewährleisten. [ 14 ]
Referenzen
- ^ „Namensänderung von POSOCO“ .
- ^ „Seite 25 des CABIL-Berichts des Forums der Regulierungsbehörden“ (PDF) .
- ^ „Pradhan-Komiteebericht“ (PDF) .
- ^ "Sitzung unter dem Vorsitz von Sekretär Power am 07.08.2008" (PDF) .
- ^ „Satnam Singh Committee Report“ (PDF) .
- ^ „CERC Gebühren- und Entgeltverordnung 2009“ (PDF) .
- ^ "eGazette zur Gründung von POSOCO als unabhängiges Unternehmen unter dem Ministerium für Energie der indischen Regierung" (PDF) .
- ^ „CABIL-Bericht des Forums der Regulierungsbehörden“ (PDF) .
- ^ „Elektrizitätsgesetz 2003“ .
- ^ „Nationale Elektrizitätspolitik 2005“ .
- ^ "Vorstand von POSOCO" .
- ^ "Ursprung von POSOCO" .
- ^ „Wieder ohne Strom: Stromnetze im Norden und Osten fallen aus“ . 31. Juli 2012.
- ^ "„Unabhängige Prüfung der Stromnetze innerhalb von 3 Monaten“" . 7. August 2012.